0004 / W912PL14D0054 - SANTA MARIA RIVER FLOOD RISK MANAGEMENT AND BRADLEY CANYON MITIGATION RESTORATION, SANTA BARBARA, CALIFORNIA, USACE, LOS ANGELES, DISTRICT
Delivery Order - 541620 Environmental Consulting Services
Contractor
RECON ENVIRONMENTAL
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
06/01/2015
Obligated Amount
$124.9k
0004 / W912PL10D0055 - STATEMENT OF WORK HVAC BLDG 2800 EDWARDS AIR FORCE BASE, CA AAPB: CAEA-1283 PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION TO PROVIDE AND INSTALL A NEW HIGH EFFICIENCY HVAC SYSTEM CONSISTING OF THERMAL ENERGY STORAGE (TES) SYSTEM WITH SUFFICIENT THERMAL ENERGY STORAGE FOR ON-PEAK HOURS (1130-1800) FOR BLDG. 2800. THE WORK TO BE ACCOMPLISHED IS AS FOLLOWS: REPAIR CHILLERS BY PROVIDING/ INSTALLING THE NECESSARY HARDWARE/FIRMWARE TO THE CHILLERS PERFORM A COMPLETE MANUFACTURERS OVERHAUL/ ANNUAL MAINTENANCE BY A FACTORY TRAINED TECHNICIAN TO THE EXISTING CHILLERS, PROVIDE A GLYCOL MANAGEMENT SYSTEM AND ADD TES TO THE EXISTING CHILLERS SYSTEM. PROVIDE AND INSTALL NEW FOUNDATION AND BLOCK WALL TO MATCH THE EXISTING ALREADY IN PLACE. PROVIDE AND INSTALL TWO NEW CHILLED WATER PUMPS; MODIFY THE CURRENT CONTROL SYSTEM AT B2800 TO ACCOMMODATE THE NEW TES SYSTEM. PROVIDE AND INSTALL TWO NEW HOT WATER PUMPS. THE PERFORMANCE PERIOD IS 240 CALENDAR DAYS FROM THE TIME THE CONTRACTOR RECEIVES THE OFFICIAL NOTICE TO PROCEED FROM THE CONTRACTING OFFICER S REPRESENTATIVE AT THE EDWARDS RESIDENT OFFICE. CONTRACTOR IS REQUIRED TO USE CURRENT DAVIS BACON WAGE DETERMINATION CA120031. LIQUIDATED DAMAGES ARE $1,060.00 PER DAY.
Delivery Order - 236220 Commercial and Institutional Building Construction
Contractor
ALPINE DIVERSIFIED, INC.
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
09/30/2012
Obligated Amount
$588.7k
0001 / W912PL10D0008 - TAS::96 3122::TAS ARRA::YES::ARRA RECOVERYPROJECT#::099990::RP# PROJECT 600-09-205 RECOVERY B126 REPLACE ELECTRICAL EQUIPMENT, PHASE II PROVIDE ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT, AND DESIGN-BUILD SERVICES NECESSARY FOR DESIGN AND CONSTRUCTION OF RECOVERY B126 REPLACE ELECTRICAL EQUIPMENT, PHASE II AND MODIFICATIONS PER DESIGN DRAWINGS AND SPECIFICATIONS AT THE LONG BEACH VETERANS MEDICAL CENTER, LONG BEACH, CALIFORNIA. B. PROJECT SPECIFIC REQUIREMENTS FOR: 1.PROJECT 600-09-205 RECOVERY B126 REPLACE ELECTRICAL EQUIPMENT, PHASE II A. THE DESIGN BUILD CONTRACTOR IS TO PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DESIGN-BUILD SERVICES NECESSARY FOR DESIGN BUILD OF PROJECT 600-09-205 RECOVERY B126 REPLACE ELECTRICAL EQUIPMENT, PHASE II AND MODIFICATIONS PER DESIGN DRAWINGS AND SPECIFICATIONS AT THE LONG BEACH VETERANS MEDICAL CENTER, LONG BEACH, CALIFORNIA. INCLUDE ALL DESIGN, DRAWING, SPECIFICATIONS, ENGINEERING, CONSTRUCTION AND ADMINISTRATION REQUIRED TO SATISFY THE REQUIREMENTS STATED IN THE RFP. SCOPE OF WORK IS LIMITED TO BUILDING 126 AND INCLUDES BUT NOT LIMITED TO THE FOLLOWING: 1. PROVIDE 100% CONSTRUCTION DOCUMENTS (PLANS AND SPECIFICATIONS) BASED ON THE 65% CONSTRUCTION DOCUMENTS IN THE RFP. 2. REPLACE SWITCHBOARDS INDICATED IN THE RFP. 3. REPLACE MOTOR CONTROL CENTERS INDICATED IN THE RFP. 4. REPLACE DISTRIBUTION PANEL BOARDS INDICATED IN THE RFP. 5. REPLACE BRANCH CIRCUIT PANEL BOARDS INDICATED IN THE RFP. 6. REPLACE DRY-TYPE TRANSFORMERS INDICATED IN THE RFP. 7. REPLACE ENCLOSED CIRCUIT BREAKERS INDICATED IN THE RFP. 8. PROVIDE TEMPORARY POWER TO FEED THE LOADS OF THE SWITCHBOARDS, MCC, PANEL BOARDS AND TRANSFORMERS BEING REPLACED. ANY POWER OUTAGE SHALL BE MINIMIZED AND CAREFULLY COORDINATED WITH VALB PROJECT MANAGER AND CORPS OF ENGINEERS RESIDENT ENGINEER. 9. RELOCATE ELECTRICAL EQUIPMENT TO MEET REQUIRED NEC CLEARANCE REQUIREMENTS. EXTEND FEEDER AND BRANCH CIRCUIT WIRING TO THE NEW LOCATIONS AS REQUIRED. 10. PROVIDE STRUCTURAL SUPPORT FOR THE ELECTRICAL EQUIPMENT DESIGNED BY STRUCTURAL ENGINEER. 11. PROVIDE A CONSTRUCTION PHASING PLAN TO BE COORDINATED AND APPROVED BY VALB AND CORPS OF ENGINEER RESIDENT ENGINEER. 12. GENERAL REQUIREMENTS: 12.1 CONSTRUCTION WORK SHALL BE PERFORMED WITHIN THE HOURS OF 5:00 PM AND 3:00 AM. 12.2 PROVIDE A MINIMUM 14-DAY NOTICE TO THE GOVERNMENT BEFORE ANY ELECTRICAL OUTAGE. MAXIMUM OUTAGE OF 8 HOURS IS ACCEPTABLE WHEN REPLACING A TRANSFORMER. 12.3 PROVIDE AN ADEQUATE NUMBER OF TEMPORARY PANELS TO AVOID WORK STOPPAGE AND DELAYS. 12.4 IN AREAS WHERE THE TEMPORARY PANELS HAVE TO BE LOCATED OUTSIDE THE ELECTRICAL ROOMS BECAUSE OF SPACE RESTRICTIONS, WORK HAS TO BE PERFORMED ON WEEKENDS. 12.5 REPLACE EQUIPMENT ON NORMAL POWER PRIOR TO REPLACING EQUIPMENT ON EMERGENCY POWER. START WORK ON THE TOP FLOOR. 12.5.1 CONTRACTOR CAN WORK ON ONLY ONE PANEL PER FLOOR AT A TIME, ON AS MANY FLOORS AS POSSIBLE. 12.6 CONTRACTOR SHALL COMPLY WITH ALL THE SAFETY REQUIREMENTS OF OSHA AND VHA DIRECTIVE 2006-056. B. PROVIDE FOR AND MAINTAIN ALL NECESSARY PROTECTION OF BUILDING SYSTEMS AND SERVICES DURING CONSTRUCTION. PROVIDE COVER TO ANY EQUIPMENT IN CONSTRUCTION AREAS TO PROTECT FROM DUST BUILDUP WHILE PERFORMING WORK. PERFORM TOUCH-UP PAINTING OF ALL AFFECTED AREAS AS NEEDED. C. CONTRACTOR SHALL PREPARE AND SUBMIT FOR APPROVAL SHOP DRAWINGS AND PRODUCT DATA OF INTENDED EQUIPMENT AND MATERIALS TO BE USED. PROVIDE MANUFACTURER INFORMATION, CATALOG CUTS, AND SHOP DRAWINGS TO CLEARLY INDICATE CONSTRUCTION WORK. DO NOT START CONSTRUCTION UNTIL ALL MATERIALS, SUBMITTALS, AND EQUIPMENT ARE ON HAND.
Delivery Order - 236220 Commercial and Institutional Building Construction
Contractor
DWG & ASSOCIATES, INC.
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
09/29/2010
Obligated Amount
$1.4M
0005 / W912PL09D0078 - TAS::96 3135::TAS PROGRAM CODE 011860 MORRO BAY HARBOR, CA QUALITY ASSURANCE SERVICES SUPPORT THE MANAGEMENT OF THE VANDENBERG AFB CONSTRUCTION CONTRACT NO. W912PL-09-C-0018, MAINTENANCE DREDIGN AT MORRO BAY, CA.
Delivery Order - 561990 All Other Support Services
Contractor
ECO & ASSOCIATES INC
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
01/05/2010
Obligated Amount
$77k
0001 / W912PL09D0078 - TAS::96 3134::TAS #105152 PORT OF LONG BEACH(DEEPENING)CA QUALITY ASSURANCE REPRESENTATIVES TO SUPPORT THE MANAGEMENT OF CONSTRUCTION CONTRACTS AT THE PORT OF LONG BEACH.
Delivery Order - 561990 All Other Support Services
Contractor
ECO & ASSOCIATES INC
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
09/30/2009
Obligated Amount
$121.2k
0004 / W912PL05D0005 - CONSTRUCTION MANAGEMENT SERVICES NELLIS RESIDENT OFFICE, NV REPORT NO. 07-0978
Delivery Order - 541330 Engineering Services
Contractor
ASSET Group (ASSET GROUP INC)
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
09/30/2007
Obligated Amount
$295.2k
0001 / W912PL05D0005 - W912PL USA ENGINEER DIST LOS ANGELES W912PL05D0005 N 0001 N ASSET GROUP INC 5011 ARGOSY AVE STE 4 HUNTINGTON BEA CA HUNTINGTON BEACH ORANGE CALIFORNIA N A&E MANAGEMENT ENGINEERING SERVICES S1 SERVICES 000 * E 5 S B U 2 D N A Y A A Y Y
Delivery Order - 541330 Engineering Services
Contractor
ASSET Group (ASSET GROUP INC)
Contracting Agency/Office
Army»Army Corps of Engineers»South Pacific Division»Los Angeles District
Effective date
01/21/2005
Obligated Amount
$848.5k