Armstrong Flight Research Center Awarded Task Orders and BPA Calls - Systems Engineering | Federal Compass

Armstrong Flight Research Center Awarded Task Orders and BPA Calls - Systems Engineering

With the most comprehensive market intelligence platform,
we have Armstrong Flight Research Center systems engineering task orders covered.

80AFRC19F0260 / NND16FR01Z / GS10F0202X - NASA AFRC REQUIRES A PAYLOAD ENGINEER WITH EXTENSIVE KNOWLEDGE OF THE GLOBAL HAWK AIRCRAFT, NASA PAYLOAD SYSTEMS AND GROUND CONTROL STATION, AND THE SCIENTIFIC PAYLOADS THAT ARE BEING INTEGRATED INTO THE 2 NASA GLOBAL HAWK UNMANNED AERIAL VEHICLES.
BPA Call - Multiple Award Schedule (MAS) - 541330 Engineering Services
Contractor
FRATELLO, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
09/27/2019
Obligated Amount
$36k
80AFRC18F0170 / NND16FR01Z / GS10F0202X - SUPPORT SENSOR PAYLOAD AND DATA SYSTEM INTEGRATION AND TESTS ASSOCIATED WITH THE UAV BASED RANGE (UAVBR) PROJECT. ORDER ISSUED UNDER BPA NND16FR01Z THAT PROVIDES PAYLOAD ENGINEERING SUPPORT FOR THE NASA GLOBAL HAWK PROGRAM.
BPA Call - Multiple Award Schedule (MAS) - 541330 Engineering Services
Contractor
FRATELLO, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
09/21/2018
Obligated Amount
$36k
80AFRC18F0131 / NND15SA42B - THIS TASK ORDER IS ISSUED TO PERFORM IN COOPERATION WITH NASA THE INTEGRATION OF THE ELECTRIC PROPULSION SYSTEM FOR THE X-57 AIRCRAFT. THE CONTRACTOR SHALL PROVIDE CONTINUED ENGINEERING SERVICES TO INTEGRATE THE ELECTRICAL MOTORS INTO THE TECNAM ENGINE NACELLES, AND PERFORM THE REQUIRED TRACTION SYSTEM, COMMAND SYSTEM, AND INSTRUMENTATION INTEGRATION IN THE AIRCRAFT.
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
08/06/2018
Obligated Amount
$399k
80AFRC18F0123 / 80AFRC18D0009 - ARCHITECT AND ENGINEERING SERVICES FOR B4838 DATA COOLING SYSTEM OPTIMIZATION
Delivery Order - AFRC Architect-Engineering A/E Services (2018) - 541310 Architectural Services
Contractor
DEVELOPMENT ONE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
07/16/2018
Obligated Amount
$60.6k
80AFRC18F0083 / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST.
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
04/09/2018
Obligated Amount
$120k
80AFRC18F0030 / NND08RR01B - CL TASK ORDER NO. 80AFRC18F0030 SIMULATION ENGINEERING&DATR SYSTEMS QUALITY ENGINEERING
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
JACOBS TECHNOLOGY INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
01/31/2018
Obligated Amount
$367.5k
80AFRC18F0031 / NND08RR01B - CL TASK ORDER NO. 80AFRC18F0031 SENSORS AND SYSTEMS ENGINEERING
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
JACOBS TECHNOLOGY INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
01/31/2018
Obligated Amount
$1.1M
80AFRC17F0106 / NND15SA42B - THE CONTRACTOR WILL PERFORM IN COOPERATION WITH NASA THE DESIGN AND INTEGRATION OF AN ELECTRIC PROPULSION SYSTEM FOR THE SCALABLE CONVERGENT ELECTRIC PROPULSION TECHNOLOGY OPERATIONAL RESEARCHER (SCEPTOR) PROJECT. THE SCEPTOR PROJECT WILL RETROFIT A PRODUCTION TECNAM P2006T AIRCRAFT (MINUS THE ROTAX ENGINES) WITH AN ELECTRIC PROPULSION SYSTEM. TWO AIRCRAFT SUBSYSTEMS, THE CRUISE MOTOR CONTROLLER (CMC) AND THE BATTERY MANAGEMENT SYSTEM (BMS), CONTAIN SAFETY CRITICAL SOFTWARE. IN ORDER TO PROCEED TO FLIGHT, THE SCEPTOR PROJECT MUST FIRST BE GRANTED APPROVAL TO FLY BY THE AFRC AIRWORTHINESS AND FLIGHT SAFETY REVIEW BOARD (AFSRB). AUTHORITY TO FLY IS GRANTED AFTER THE SCEPTOR PROJECT PRESENTS TO THE BOARD ITS PLAN FOR AIRWORTHINESS AND IS SUBSEQUENTLY AGREED TO BY THE BOARD. THIS REQUIRES THAT ALL FLIGHT SAFETY CRITICAL SOFTWARE BE DESIGNED AND TESTED TO NASA STANDARDS AS SPECIFIED IN THE SOFTWARE MANAGEMENT PLAN (SMP-CEPT-001). THE SCEPTOR BMS AND CMC SOFTWARE SYSTEMS HAVE BEEN DEEMED LEVEL 1-S SAFETY CRITICAL SOFTWARE. THEY WILL NEED TO BE UNIT TESTED AND ALSO VERIFIED AT THE SYSTEM LEVEL. ALSO, NASA REQUIRES TEST SUPPORT FOR THE COCKPIT DISPLAY SYSTEM (CDS) AND THROTTLE ENCODER (TE) SYSTEM.
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
09/26/2017
Obligated Amount
$250k
80AFRC17F0014 / NNJ11HB94C - THE COMMERCIAL PARTNERSHIPS PORTFOLIO WITHIN NASA'S SPACE TECHNOLOGY MISSION DIRECTORATE (STMD) ENCOMPASSES SIX KEY PROGRAMS: (1) FLIGHT OPPORTUNITIES, (2) SMALL BUSINESS INNOVATION RESEARCH (SBIR) / SMALL BUSINESS TECHNOLOGY TRANSFER (STTR), (3) CENTENNIAL CHALLENGES, (4) PRIZES&CHALLENGES, (5) REGIONAL ECONOMIC DEVELOPMENT, AND (6) EMERGING SPACE GRANTS. THESE PROGRAMS REPRESENT A KEY ASPECT OF NASA'S STRATEGY TO STIMULATE THE COMMERCIAL SPACE INDUSTRY AND SPARK ECONOMIC GROWTH, WHILE LEVERAGING THE INDUSTRY'S COMMERCIAL CAPABILITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS, TO DELIVER TECHNOLOGIES AND CAPABILITIES NEEDED FOR FUTURE NASA, OTHER GOVERNMENT AGENCY, AND COMMERCIAL MISSIONS. IN SUPPORT OF THAT STRATEGY, THE FLIGHT OPPORTUNITIES (FO) PROGRAM IS HELPING TO FOSTER MATURATION OF COMMERCIAL FLIGHT OPPORTUNITIES FOR THE RAPID DEVELOPMENT OF SPACE TECHNOLOGY. MATURATION, AND THROUGH MATURATION, ADOPTION OF A NEW AND INNOVATIVE SPACE TECHNOLOGY IS DEPENDENT ON THE ABILITY TO DEMONSTRATE THE TECHNOLOGY IN A RELEVANT OPERATIONAL ENVIRONMENT PRIOR TO MISSION USE. THE NASA FO OFFICE HAS UTILIZED A CONTRACT WITH THE AEROSPACE CORPORATION (AEROSPACE) TO SUPPORT IT IN AWARDING EFFORTS TO DEVELOP THE SUBORBITAL AND SMALL SATELLITE (SMALLSAT) MARKET. NASA AWARDED THE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (SEETS) CONTRACT (NNJ11HB94C) TO AEROSPACE IN APRIL 2011 AS AN AGENCY INDEFINITE QUANTITY INDEFINITE DELIVERY (IDIQ) CONTRACT THAT IS ADMINISTERED BY THE NASA JOHNSON SPACE CENTER (JSC). UNDER PREVIOUS TASK ORDERS ISSUED TO AEROSPACE BY THE NASA ARMSTRONG FLIGHT RESEARCH CENTER (AFRC), AEROSPACE HAS PROVIDED TECHNICAL AND COMMERCIAL SPACE ANALYSIS OF FO SUBORBITAL AND SMALL ORBITAL LAUNCH VEHICLE DEVELOPMENT AND FLIGHT CAMPAIGNS, AS WELL AS EXPERIMENTAL PAYLOAD DEVELOPMENT AND TESTING. AEROSPACE ALSO PROVIDED ASSISTANCE WITH TECHNICAL MONITORING OF AND REPORTING ON ACTIVITIES BEING PERFORMED UNDER ONGOING PUBLIC-PRIVATE PARTNERSHIPS, INCLUDING FO ANNOUNCEMENT OF COLLABORATIVE OPPORTUNITIES (ACO) AND TIPPING POINT PROJECTS. AEROSPACE SUBJECT MATTER EXPERTS (SMES) PERFORMED AN INDEPENDENT ASSESSMENT OF EFFECTS OF SPIN-STABILIZED ROCKET FLIGHT ENVIRONMENTS ON THE NASA AMES RESEARCH CENTER (ARC) AFFORDABLE VEHICLE AVIONICS (AVA) DEVELOPMENTAL SYSTEM. EARLIER RELEVANT ACCOMPLISHMENTS INCLUDE DEVELOPMENT OF A MODEL BASED ON THE ECO-PHYSICS OF LAUNCH FOR CHARACTERIZING MARKET DEMAND FOR SUBORBITAL REUSABLE LAUNCH VEHICLES (SRLVS) TO GAIN MARKET INSIGHT, AND ANALYSIS OF TECHNICAL INVESTMENTS SUPPORTING STMD SUBORBITAL AND SMALLSAT INITIATIVES. AEROSPACE ALSO IDENTIFIED AND ANALYZED SRLV AND SMALLSAT MARKET BARRIERS, FOCUSING ON AFFORDABLE LAUNCH PRACTICES AND IDENTIFICATION OF TIPPING POINT INVESTMENT AREAS TO BETTER ASSURE COMMERCIALIZATION OF NEW RELEVANT TECHNOLOGIES. IN ADDITION, AEROSPACE PERFORMED A PARAMETRIC STUDY ON PROJECTED SAFETY OF SRLVS AND OF SPACE FLIGHT PARTICIPANTS (SFPS) ABOARD TO MONITOR TECHNOLOGY DEMONSTRATION PAYLOADS. TO FACILITATE OPTIMIZATION OF STMD INVESTMENT OPPORTUNITIES WITH U.S. INDUSTRY, THE FO PROGRAM IS TASKING AEROSPACE TO CONTINUE PROVIDING TECHNICAL AND COMMERCIAL SPACE ANALYSIS TO ONGOING AND FUTURE PROJECTS ADDRESSING COMMERCIAL SMALL LAUNCH CAPABILITIES. AEROSPACE WILL IDENTIFY AND ANALYZE SRLV AND SMALLSAT LAUNCH TECHNOLOGY BARRIERS, FOCUSING ON SYSTEM PERFORMANCE IMPROVEMENTS AND ENABLING TECHNOLOGIES, WILL ASSESS OPPORTUNITIES FOR FURTHERING COMMERCIAL ENGAGEMENT, AND WILL PERFORM FURTHER ANALYSIS OF RISKS TO SPACEFLIGHT PARTICIPANTS (SFPS) ABOARD SRLVS TO MONITOR TECHNOLOGY DEMONSTRATION PAYLOADS.
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
The Aerospace Corporation (THE AEROSPACE CORPORATION)
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
08/29/2017
Obligated Amount
$298.9k
NND17SA64T / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST.
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
06/09/2017
Obligated Amount
$225.9k
NND17SA61T / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
05/17/2017
Obligated Amount
$665.9k
NND17SA40T / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST.
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
05/12/2017
Obligated Amount
$100k
NND17SA39T / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
04/18/2017
Obligated Amount
$64.7k
NND17SA38T / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
04/18/2017
Obligated Amount
$43.8k
NND17SA63T / NND15SA42B - IN ORDER TO DESIGN, ANALYZE, BUILD, TEST OPERATE, MAINTAIN AND SUSTAIN THE CEPT FOR THE RESEARCH PHASE, NASA AFRC REQUIRES THE ENGINEERING AND TECHNICAL SUPPORT OF ESAERO WHICH, AS THE DEP WING PRIME CONTRACTOR, HAS THE UNIQUE KNOWLEDGE AND POSSESSES PROPRIETARY INFORMATION OF THE DEP WING AND ASSOCIATED SUB-SYSTEMS. THIS EFFORT INCLUDES THE MODIFICATION OF AN EXISTING GA AIRCRAFT WITH NASA FURNISHED ELECTRIC MOTORS, NASA DRIVEN POWER MANAGEMENT AND DISTRIBUTION SYSTEM DESIGN, INTO AN ELECTRIC DISTRIBUTED PROPULSION SYSTEM. IN ADDITION, AFRC NEEDS UNIQUE ESAERO EXPERTISE SUPPORT, SPARE PARTS, TOOLS, TECHNICAL DATA, SOFTWARE, TROUBLESHOOTING ANALYSES AND EVALUATIONS OF SYSTEM FAILURES, MAINTENANCE AND OPERATIONS PROCEDURES AND/OR DRAWINGS USED IN THE TEST SYSTEMS MAINTENANCE AND/OR DESIGN AND MANUFACTURE TO FACILITATE MODIFICATION AND/OR REPAIR OF THE TEST SYSTEMS IN SUPPORT OF SPECIFIC CEPT RESEARCH PROJECTS. THE TECHNICAL ASSISTANCE INCLUDES REVIEWING PLANNED TEST SYSTEMS MODIFICATIONS, DEVELOPING INSTRUMENTATION SYSTEMS FOR DATA COLLECTION, PROVIDING DESIGN SUPPORT FOR UNIQUE ESAERO SYSTEMS, AND ASSISTANCE IN AFRC PERFORMED ANALYSIS. THE CONTRACTOR MAY BE REQUIRED TO MODIFY OR TO PARTICIPATE/ASSIST IN THE MODIFICATION OF INTERNAL AIRCRAFT AVIONICS SYSTEMS, AIRCRAFT CONTROL SYSTEMS HARDWARE AND SOFTWARE, PERFORM AIRCRAFT MODIFICATIONS, AND FABRICATE EXPERIMENTAL HARDWARE, WHERE THE INTIMATE KNOWLEDGE OF THE MANUFACTURED AIRCRAFT IS AN IMPORTANT FACTOR. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR ACCEPTANCE, QUALIFICATION AND INTEGRATION TESTING OF MOTORS, CONTROLLERS, AND AVIONICS AND OTHER ELECTRONIC SYSTEMS FOR CEPT VEHICLE. AFRC MAY ALSO REQUEST RESEARCH STUDIES USING ESAERO DEVELOPED MODELS AND EXPERTISE WHICH MAY INCLUDE MODELING OF A SMALL HYBRID ELECTRIC DISTRIBUTED PROPULSION SYSTEM AND ENGINEERING DESIGN AND FABRICATION SUPPORT OF THE HYBRID ELECTRIC INTEGRATED SYSTEM TESTBED (HEIST). HEIST IS A STATIC HYBRID ELECTRIC DISTRIBUTED PROPULSION GROUND TEST BENCH FOR TESTING OF THE DISTRIBUTED PROPULSION HARDWARE COMPONENTS. THE CONTRACTOR SHALL PROVIDE SUPPORT REQUIRED TO ACHIEVE THE INTEGRATION, TEST, MAINTENANCE, HARDWARE AND SOFTWARE MODIFICATIONS TO THE CEPT TEST SYSTEMS AND THE BUILD-UP OF HEIST
Delivery Order - 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
Contractor
EMPIRICAL SYSTEMS AEROSPACE, INC.
Contracting Agency/Office
National Aeronautics and Space Administration»Armstrong Flight Research Center
Effective date
04/17/2017
Obligated Amount
$16.5k

Let's get started today

Let's Get Started Today

Contracting Resources

Let's get started today

Let's Get Started Today

Awarded Task Orders by Industry

Let's get started today

Let's Get Started Today