927 Awarded Contracts | Federal Compass

927 Awarded Contracts

With the most comprehensive market intelligence platform,
we have 927 systems engineering contracts covered.

FA254124CB032 - SF241-D026 DIGITAL SPACEPORT OF THE FUTURE. VETS WILL UTILIZE MODEL-BASED SYSTEMS ENGINEERING (MBSE) TO DIGITIZE AND STANDARDIZE LEGACY SPACE SYSTEMS FOR SEAMLESS INTEROPERABILITY.
Definitive Contract - 927110 Space Research and Technology
Contractor
VETS, LLC
Contracting Agency/Office
Air Force
Effective date
07/09/2024
Obligated Amount
$1.9M
NNG15HZ35C - NASA GODDARD SPACE FLIGHT CENTER (GSFC) HAS A NEED TO OBTAIN SUPPORT IN ACHIEVING THE GOALS OF THE SPACE GEODESY PROJECT (SGP). THE GOALS OF THIS ACTIVITY ARE RELATED TO THE STUDY OF THE SHAPE OF THE EARTH AND HOW IT ROTATES. THIS EFFORT WILL BE A FOLLOW-ON TO NASA GSFC CONTRACT NNG10HP00C WITH MASSACHUSETTS INSTITUTE OF TECHNOLOGY (MIT)/HAYSTACK OBSERVATORY (HO) FOR RESEARCH AND DEVELOPMENT FOR THE STATE-OF-THE-ART NEXT GENERATION VERY LONG BASELINE INTERFEROMETRY (VLBI) SYSTEMS IN SUPPORT OF THE NASA SGP. UNDER THIS CONTRACT EFFORT MIT HAYSTACK OBSERVATORY SHALL PROVIDE CONSTRUCTION AND INSTALLATION OF THE SIGNAL CHAINS FOR THREE NEXT GENERATION GEODETIC VLBI ANTENNAS AND VALIDATION OF THE COMPLETED SYSTEMS; OPERATIONS SUPPORT IN THE FORM OF CORRELATION OF GEODETIC VLBI DATA, OPERATION OF THE WESTFORD ANTENNA, AND ENGINEERING SUPPORT FOR THE NASA GEODETIC NETWORK; AND CONTINUED DEVELOPMENT OF THE NEXT GENERATION GEODETIC VLBI SYSTEMS. THE HO SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND EQUIPMENT NECESSARY TO PROVIDE SUPPORT TO NASA GSFC IN ACHIEVING THE GOALS OF THE SGP. THE SCOPE OF THIS EFFORT IS LIMITED TO FIVE SPECIFIC AREAS (CALLED TASKS): 1. BUILDING VLBI GLOBAL OBSERVING SYSTEMS (VGOS) 2. VGOS SYSTEM VALIDATION 3. OPERATIONS AND SUSTAINING ENGINEERING 4. FORWARD LOOKING DEVELOPMENT 5. PROJECT MANAGEMENT
Definitive Contract - 927110 Space Research and Technology
Contractor
Massachusetts Institute of Technology (MASSACHUSETTS INSTITUTE OF TECHNOLOGY)
Contracting Agency/Office
National Aeronautics and Space Administration»Goddard Space Flight Center
Effective date
03/10/2015
Obligated Amount
$11.6M
NNM11AA49C - THIS SOW DETAILS THE WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A AND BRIDGE PHASE B CONCEPT DEFINITION PORTION OF THE DISCOVERY ANNOUNCEMENT OF OPPORTUNITY (NNH10ZDA007O) SOLICITATION FOR THE TITAN MARE EXPLORER (TIME). THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. ELLEN R. STOFAN OF PROXEMY RESEARCH, IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY DEPUTY PI DR. JONATHAN LUNINE AT CORNELL UNIVERSITY. THE APPLIED PHYSICS LABORATORY (APL) OF THE JOHNS HOPKINS UNIVERSITY IS SERVING AS THE MANAGING CENTER FOR THE MISSION, AND LOCKHEED MARTIN SPACE SYSTEMS (LM) SERVES AS THE PRIMARY CONTRACTOR. SPECIFIC OBJECTIVES OF THIS SOW TO ADDRESS THE DISCOVERY GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY (DRAFT DATED 1-11-11) TO BE OVERSEEN BY THE PI ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL - OPTIONAL INITIATION OF PHASE B WITH A PHASE A/B TRANSITION PHASE DURING PHASE A, PI STOFAN SHALL BE RESPONSIBLE FOR PROJECT PERFORMANCE OVERSIGHT, INCLUDING THE FOLLOWING: - SERVE AS THE SPOKESPERSON FOR THE MISSION TO NASA AND EXTERNAL ORGANIZATIONS. - PROVIDE SCIENCE TEAM LEADERSHIP AND OVERSEE THE MANAGEMENT OF NON-GOVERNMENT SCIENCE TEAM CONTRACTS AND GRANTS. - DEVELOP SCIENCE REQUIREMENTS, SUBORDINATE SCIENCE REQUIREMENTS, AND THE SCIENCE DATA MANAGEMENT PLAN. - PARTICIPATE IN ALL PROJECT-LEVEL REVIEWS AS DESCRIBED IN THE MISSION MASTER SCHEDULE, AND ATTEND OTHER PROJECT TECHNICAL, SCIENCE, MANAGEMENT, AND E/PO REVIEWS AND MEETINGS. - REVIEW AND CONCUR WITH THE APL PM REGARDING PROJECT AND ENGINEERING DECISIONS THAT AFFECT MISSION SUCCESS AND SCIENCE INTEGRITY. - OVERSEE THE IMPLEMENTATION OF AN EDUCATION AND PUBLIC OUTREACH PROGRAM BY APL CONSISTENT WITH NASA GOALS AND POLICIES, INCLUDING PLANS FOR STUDENT COLLABORATIONS. - COLLABORATE WITH THE MISSION INSTRUMENT TEAMS TO COMPLETE OR REFINE PLANS AND DESIGNS. - OVERSEE THE ESTABLISHMENT OF AGREEMENTS FOR INTERNATIONAL SCIENCE PARTICIPATION IN COMPLIANCE WITH FEDERAL REGULATIONS. - SUPPORT THE APL PROPOSAL DEVELOPMENT REVIEWS, AND FINAL CSR REVIEW. THIS SUPPORT IS DEFINED AS REVIEW OF PRESENTATION MATERIAL, WRITE-UPS, AND COST/SCHEDULE INPUTS. - PREPARE FOR AN OPTIONAL INITIATION OF PHASE B WITH A PHASE A/B TRANSITION PHASE.
Definitive Contract - 927110 Space Research and Technology
Contractor
PROXEMY RESEARCH, INC
Contracting Agency/Office
National Aeronautics and Space Administration»Marshall Space Flight Center
Effective date
06/30/2011
Obligated Amount
$149.9k
NNA07BC79P - ASTROBIONICS PROGRAM SYSTEMS ENGINEERING AND DESIGN SUPPORT FOR SAMLL SATELLITE DIVISION
Purchase Order - 927110 Space Research and Technology
Contractor
CAL POLY CORPORATION
Contracting Agency/Office
National Aeronautics and Space Administration»Ames Research Center
Effective date
09/07/2007
Obligated Amount
$25k
FA945306C0342 - F DET 8 AFRL/PKV8 FA945306C0342 N N TEXAS ENGINEERING EXPERIMENT S 200 GREENS PRAIRIE ROAD COLLEGE STATIO TX COLLEGE STATION BRAZOS TEXAS N A RDTE/OTHER DEFENSE-BASIC RESEARCH A2 MISSILE AND SPACE SYSTEMS 000 NOT DISCERNABLE E 3 B N 2 E Y V A A N
Definitive Contract - 541710 Research and Development in the Physical, Engineering, and Life Sciences, 541712 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology), 927110 Space Research and Technology
Contractor
TEXAS A&M ENGINEERING EXPERIMENT STATION (TEXAS ENGINEERING EXPERIMENT S)
Contracting Agency/Office
Air Force»Air Force Materiel Command»Air Force Research Laboratory»Space Vehicles Directorate (RV)»(RVK) Contracting Division
Effective date
06/16/2006
Obligated Amount
$3M
NNK06OM01C - HIGH EFFICIENCE LIGHTING WITH INTEGRATED ADAPTIVE CONTROL (HELIAC)-SBIR PHASE II HIGH EFFICIENCY LIGHTNING WITH INTEGRATED ADAPTIVE CONTROL (HELIAC) SYSTEM SBIR CONTRACT THE PRIMARY OBJECTIVE OF THE HIGH EFFICIENCY LIGHTNING WITH INTEGRATED ADAPTIVE CONTROL (HELIAC) SYSTEM PHASE II SBIR IS TO DEVELOP THE HARDWARE AND SOFTWARE NECESSARY FOR A VERSATILE, SCALABLE LIGHTING SYSTEM THAT COULD BE USED IN GROUND OR SPACE-BASED PLANT GROWTH SYSTEMS. THE HELIAC SYSTEM WILL USE A SINGLE MODULAR LIGHTING ELEMENT TO SUPPORT BOTH INTRACANOPY AND CLOSE-CANOPY APPLICATIONS. EACH MODULAR ELEMENT WILL BE A 20 LIGHT ENGINE LIGHTSICLE WITH THE INTEGRATED PLANT POSITION SENSING SYSTEM DEVELOPED DURING THE PHASE I STUDY. SINCE LEDS ARE MORE EFFICIENT WHEN THEY STAY COOL DURING OPERATION, A NEW ARRAY COOLING SYSTEM WILL ALSO BE DEVELOPED TO ALLOW MORE CONTROL OVER THE TEMPERATURE OF THE SYSTEM. THIS HAS THE POTENTIAL TO SIGNIFICANTLY INCREASE THE OVERALL EFFICIENCY OF THE SYSTEM. SOFTWARE WILL BE DEVELOPED TO ALLOW INDIVIDUAL CONTROL OF EACH LIGHT ENGINE IN THE SYSTEM. THIS INCLUDES ON/OFF CONTROL OF THE INDEPENDENT SPECTRAL ELEMENTS OF EACH LIGHT ENGINE. THE PLANT-SENSING FEEDBACK WILL BE USED TO TURN ON ONLY THE APPROPRIATE LIGHTING ELEMENTS TO ACHIEVE MAXIMUM EFFICIENCY. INDIVIDUAL DETECTION PROFILES FOR EACH PLANT TYPE MAY BE USED TO INCREASE THE EFFECTIVENESS OF THE DETECTION SYSTEM. THE ENTIRE LIGHTING SYSTEM MAY BE CONTROLLED FROM A SINGLE COMPUTER. THE CONTROL SOFTWARE WILL INCLUDE A GRAPHICAL USER INTERFACE, AND ALLOW FULLY AUTOMATED OPERATION, AS WELL AS MANUAL OPERATION. ANY SPECTRAL ELEMENT OF EVERY LIGHT ENGINE IN THE SYSTEM WILL BE INDIVIDUALLY CONTROLLABLE. THE USER WILL BE ABLE TO MONITOR THE STATUS OF EACH LIGHTING ELEMENT, AS WELL AS POWER USAGE, TEMPERATURE, AND DETECTION SYSTEM OPERATION. THE HELIAC SYSTEM WILL BE DESIGNED FOR MAXIMUM MODULARITY AND SCALABILITY. THE CONTROL COMPUTER WILL CONNECT TO A NUMBER OF INTERFACE/POWER SUPPLY UNITS VIA USB OR SOME OTHER SUITABLE CONTROL LINK, AND EACH INTERFACE/POWER SUPPLY UNIT WILL DRIVE 16 LIGHTSICLES. THE OBJECTIVES OF THIS EFFORT ARE TO BUILD ON THE EFFORTS OF THE PHASE I AND DEVELOP AND TEST A FULL-SCALE MODULAR LIGHTING SYSTEM THAT WILL SIGNIFICANTLY REDUCE THE ESM REQUIRED FOR PLANT GROWTH. THE SPECIFIC OUTPUTS OF THIS EFFORT WILL INCLUDE: 16 LIGHTSICLES CONTAINING THE HELIAC DETECTION SYSTEM TWO INTERFACE/POWER SUPPLY UNITS CONTROL SOFTWARE OPERATIONS MANUALS FOR THE PROTOTYPES TEST UNIT FOR LIGHT ENGINE SPECTRAL ENHANCEMENTS TEST UNIT FOR FLUID COOLING AND CONTROL ENHANCEMENTS TEST REPORTS
Definitive Contract - 927110 Space Research and Technology
Contractor
Sierra Nevada Corporation (ORBITAL TECHNOLOGIES CORPORATION)
Contracting Agency/Office
National Aeronautics and Space Administration»Kennedy Space Center
Effective date
01/13/2006
Obligated Amount
$600k
F2960103M0289 - GS05 DET 8 AFRL/PK (SUPPORTS VS) F2960103M0289 N N ATA ENGINEERING, INC 11995 EL CAMINO REAL SUIT SAN DIEGO CA SAN DIEGO SAN DIEGO CALIFORNIA N A RDTE/MISSILE AND SPACE SYSTEMS-BASIC RESEARCH A2 MISSILE AND SPACE SYSTEMS NOT DISCERNABLE OR CLASSIFIED E 9 C Z N 2 N B N A B N
Purchase Order - 927110 Space Research and Technology
Contractor
ATA ENGINEERING, INC. (ATA ENGINEERING, INC)
Contracting Agency/Office
Air Force»Air Force Materiel Command»Air Force Research Laboratory
Effective date
08/29/2003
Obligated Amount
$69.1k
F2960103C0079 - GS05 DET 8 AFRL/PK (SUPPORTS VS) F2960103C0079 N N CSA ENGINEERING INC 2565 LEGHORN STREET MOUNTAIN VIEW CA MOUNTAIN VIEW CONTRA COSTA CALIFORNIA N A RDTE/MISSILE AND SPACE SYSTEMS-BASIC RESEARCH A2 MISSILE AND SPACE SYSTEMS NOT DISCERNABLE OR CLASSIFIED E 3 B N 2 K Y B N A C N
Definitive Contract - 927110 Space Research and Technology
Contractor
CSA ENGINEERING INC (CSA ENGINEERING, INC.)
Contracting Agency/Office
Air Force»Air Force Materiel Command»Air Force Research Laboratory
Effective date
08/13/2003
Obligated Amount
$1.6M
F0470103C0004 - CZ62 SMC/PKJ LOS ANGELES AFB F0470103C0004 N N EMS TECHNOLOGIES, INC 660 ENGINEERING DRIVE NORCROSS GA NORCROSS GWINNETT GEORGIA N A RDTE/MISSILE AND SPACE SYSTEMS-APPLIED RESEARCH A2 MISSILE AND SPACE SYSTEMS NOT DISCERNABLE OR CLASSIFIED E 3 B N N 2 B Y C Z A A N
Definitive Contract - 927110 Space Research and Technology
Contractor
Honeywell International (EMS TECHNOLOGIES, INC)
Contracting Agency/Office
Air Force
Effective date
03/03/2003
Obligated Amount
$234.6k
F2960102C0269 - GS05 DET 8 AFRL/PK (SUPPORTS VS) F2960102C0269 N N CSA ENGINEERING INC 2565 LEGHORN STREET MOUNTAIN VIEW CA MOUNTAIN VIEW SAN BERNARDINO CALIFORNIA N A RDTE/MISSILE AND SPACE SYSTEMS-BASIC RESEARCH A2 MISSILE AND SPACE SYSTEMS NOT DISCERNABLE OR CLASSIFIED E 3 B Z N 2 K N B N A B N
Definitive Contract - 927110 Space Research and Technology
Contractor
CSA ENGINEERING INC
Contracting Agency/Office
Air Force»Air Force Materiel Command»Air Force Research Laboratory
Effective date
09/25/2002
Obligated Amount
$70k
F2960102C0247 - GS05 DET 8 AFRL/PK (SUPPORTS VS) F2960102C0247 N N CSA ENGINEERING INC 2565 LEGHORN STREET MOUNTAIN VIEW CA MOUNTAIN VIEW SAN BERNARDINO CALIFORNIA N A RDTE/MISSILE AND SPACE SYSTEMS-BASIC RESEARCH A2 MISSILE AND SPACE SYSTEMS NOT DISCERNABLE OR CLASSIFIED E 3 B Z N 2 K Y B N A B N
Definitive Contract - 927110 Space Research and Technology
Contractor
CSA ENGINEERING INC
Contracting Agency/Office
Air Force»Air Force Materiel Command»Air Force Research Laboratory
Effective date
09/23/2002
Obligated Amount
$69.2k

Let's get started today

Let's Get Started Today

Contracting Resources

Awarded Contracts by Agency

Let's get started today

Let's Get Started Today

Awarded Contracts by Industry

Let's get started today

Let's Get Started Today